In the Winter 2003 WOA N/L, I reported on re-bedding the keels of Centaur Raggy Ray. This summer (July 2015) my own boat, Blue Spindrift CR796, had been out of the water for two years. This presented a good opportunity to re-bed the keels as the boat was very dry, having been sheeted over. During the 23 years I have owned Blue Spindrift I had not had keel stud leaks but the boat being 41 years old I wanted to take pre-emptive action. The general approach was as for Raggy Ray, Blue Spindrift being on the same type of purpose built railway bogey, a goal post on each side from which to suspend slings and chain hoists.
Getting access to the nuts on the keel studs
Blue Spindrift has the B-layout. The starboard side was tackled first, taking the framing and sliding doors from the galley locker. The locker vertical partition is easily removed. It is held in place by two screws at the top, the bottom located by two pins. With the screws removed it lifts out. The shelf can then be canted towards the back of the locker revealing the studs. There are nine studs retaining each keel. Two on each side were covered by GRP. I missed one initially as it was well buried. Glass fibre mat securing the aft galley bulkhead covered these studs. This was chipped away with a chisel. The GRP removed was retained for future reference such as surveyor, purchaser or insurer’s interest.
The nuts on Raggy Ray had been unscrewed with a 15” adjustable spanner. On Blue Spindrift, more webs necessitated using ¾” and ½”square drive sockets. The studs are of three different sizes. Rather a mix of tools was used, a 1½” A/F socket on the largest nuts and a 30mm on the middle size, both ¾” square drive. On the smallest studs a ½” square drive 13/16” spark plug socket did the job, having long reach. On all except the two smallest studs a nut and lock nut were screwed down on a round washer over a rectangular plate. The nuts on the small studs screwed down on round washers alone. Having removed the plates it became clear from the string and sealant below them that a previous owner had experienced leaks. String and sealant is a proven method of stopping keel stud leaks but is not as thorough a job as re-bedding. The string fibres were still damp. None was found under the glassed in nuts which had not been disturbed since the boat’s building.
Lifting the hull and separation from of the keel
Two heavy slings were suspended from the port goal post, led under the belly of the boat and attached to chain hoists on the starboard side. The chain hoists were slung from doubled and redoubled lifting strops looped over the goal post uprights. A large bow shackle attached the strop to one chain hoist, there being too many turns for its hook. Plastic bags were placed over the chain hoists to keep rain off them. The starboard side was lifted an inch or so, the keel lifting with the hull. To separate the keel from the hull required force applied by a row of shallow angle oak wedges. When using wedges it was useful to have chalk marks on the keel indicating the positions of the studs. For safety, nuts were left on the ends of the studs. It is important not to loose the alignment of the keel studs and their holes. The keels weigh 1,400lbs each so if the alignment was lost manipulating them to re-insert the keel studs would not be easy. The lifting equipment used was long time expired but the loads were a fraction of its capacity. The chain hoists were given a clean-up and generous oiling to ease their work.
Surface preparation, priming and sealing
The old sealant was scraped away with a wood chisel revealing O-rings round the studs. In view of the rubbery nature of the newer sealant to be used, Foscroc Nitoseal MS600, O-rings were considered unnecessary and the old ones were cut away. Large files and aluminium oxide paper were used to polish the mating face of the cast iron by hand. The sharp edges of a new file were useful to loosen small areas of hard black ferric tetroxide. A power sander was used on the vertical surfaces. The mating face polished up beautifully, like a cast iron cylinder head, a time consuming job. To clean up the studs a wire brush was sliced lengthways between the rows of wires with a hacksaw to make it thin enough to use in the gap. When working in the gap, to guard against accidents some hardwood wedges were left in place.
Half the quantity of the Fosroc two pack primer MS2 was mixed. This turned out to be far too much. It takes less than an egg cup full to prime the mating face as the primer is quite mobile. The remainder of the mixed primer was retained to check on its curing. For the other keel much less was mixed. The primer cans are sold individually, one of part A and one of part B costing £45 inc. VAT. The sealant Nitoseal MS600 is sold in boxes of ten 600ml foil sausages at around £180 inc. VAT. One cuts the end off a sausage and inserts it into a specially designed mastic gun ( £35 inc.VAT). Inserting the sealed end of the sausage into the gun from the nozzle end keeps most of the inside of the gun clean. A solvent cleaner is needed to clean it. Fosroc sell their Nuwash Solvent Cleaner 5L for £35 inc.VAT. Cellulose thinners would probably do the job. Fosroc products were used on Westerly yachts when they were first built and are widely used in the construction industry. They are well worth sourcing rather than accepting substitutes. After priming, within the specified two hours the Nitoseal MS600 sealant was applied. One 600ml sausage was just enough for a keel though more generous application would help guard against voids. The hull was then lowered down onto the keel. Sealant squeezed out of the join was smoothed with a rubber gloved hand. The sealant was given three days to part cure before the nuts were pulled down. After another three days they were tried again and the lock nuts fitted using thread locking compound. As with GRP cuttings, samples of the primer and sealant were retained.
Changing the chain hoists to the port side the process was repeated on the port keel. Here the GRP over one stud was awkward to reach. A web was in the way, requiring a mirror to see what one was doing. A circle of holes was drilled in the fibre glass mat overlaying the stud. These were joined up using a keyhole saw. The other glassed over stud was more accessible but required access holes cutting from the top and the side of the bulkhead and adjacent web boxing it in. Once again wedges were needed to separate the keel from the hull. One could see the old sealant stretching and giving way. To encourage separation the lower edge of the raised keel was wiggled with a five foot pinch bar. The keel then came down with a wumpff onto the plywood lining the steel channel of the bogey.
Other observations and comments
Some minor sealing inside the boat is necessary where GRP was cut away so as to maintain the watertight integrity of the lockers which double as buoyancy compartments.
During re-bedding, when lifting one side of the boat, the belly slings attached vertically outside the beam of the boat, the boat was squeezed enough to prevent insertion of the main hatch wash boards. This points to the importance of spreaders on crane slings, there being much more crushing force when a boat is suspended from a crane hook.
Lifting a hull for re-bedding keels has been carried out in our club yard successfully using a trolley jack. Timber and sand bags were used to spread the load and conform to the underside of the boat.
A mains fluorescent strip light and inspection lamp with fluorescent bulb were used to light the main cabin. GRP is unpleasant stuff to work with so a most useful item was a vacuum cleaner. A dust mask was worn when drilling the GRP.
The old keel mastic was still soft but didn’t have the elasticity of the new material, materials science having moved on in the interim. Fosroc products performed well on Raggy Ray and have come fully up to expectation on Blue Spindrift. I hope that Fosroc’s association with Westerly will continue and that the company will make part cases of the sealant Nitoseal MS600 available.