Some years ago during the first weeks of a major refit of our Berwick Spindrift III of Fal, whilst laid up under cover at Dinas Boatyard on the Menai Straits, we found climbing over the fixed pushpit rail time and time again very tiring. So we cut out the centre rail and refitted it as a gate hinged at one end. This made climbing on and off the boat much easier and also provided easier access for materials like the plywood panels, timber etc. used during the refit. Boarding via the stern ladder from the dinghy is now also a lot easier.
Latterly we found the original cockpit gratings were taking a bit of a beating as the step down from the cockpit lockers onto them is quite high. So we decided to fit a small step across the aft end of the cockpit over the top of the rudder shaft. The details of this step are shown in. This has proved to be a very useful modification. It has worked well for several years and is much less stressful to our pensioner’s hips and knees. The only addition to it has been a brass strip to protect the leading edge of the step which is beginning to show signs of wear.
As bought Spindrift III was fitted with single speed sheet winches with integral handles fitted to the base of the winch. We discovered very quickly that I didn’t have sufficient strength to winch in the genoa in anything of a breeze. This wasn’t doing my elbows or shoulders any good either. Also the genoa we were using was smaller than standard i.e. only 230sq.ft. rather than the 330sq.ft one usually found on a ketch rigged Berwick. One winter in the yard Geoff, a friend with a Sadler 29, mentioned that he was upgrading his two speed sheet winches to self-tailing ones so his standard Lewmar 40 two speed winches were for sale. So we purchased them and fitted them in place of our single speed sheet winches. Once afloat we discovered what a difference they made to tacking up and down the Menai Straits. Sheeting in and trimming the working jib became so much easier but sheeting in the genoa in a breeze was still hard work. But this revealed another problem when using the sheet winches as the handles now fit into the top of the winch. If you have dodgers fitted round the cockpit there isn’t enough room to rotate a standard length handle through 360 degrees. So we purchased the shortest winch handle we could find. This worked but meant that your hand caught the dodger every time you turned the winch through 360 degrees. Another local Westerly owner, Derek, at the time sailing a Typhoon, was using a portable winch driver to provide power to his various winches. This we researched only to discover that the power tool required would cost over four hundred pounds and like all portable power tools would require charging. But we did find that the bit used to connect the power tool to the winch cost about thirty five pounds. The bit, called a ‘Winch Bit ’is made in the USA and was purchased from American Marine Services. The idea was to see if we could attach this to an ordinary ½ inch drive reversible ratchet. We found the winch bit fitted neatly into a 12mm ½ drive socket.
Once this socket and winch bit were attached to the ratchet it worked the sheet winch easily and with careful use of the reverse facility on the ratchet the handle didn’t catch the dodger at all. So we went ahead and epoxied the ‘winch bit’ into the 12mm socket so that it couldn’t fall out when attaching or detaching the ratchet from the winch. Using this system with the genoa in a breeze worked well, until one day the ratchet was overcome by the load on the sheet winch. So much for buying a cheap ratchet! Further research, including advice from Mike the Rear Commodore of our sailing club ‘The North West Venturer’s’, who has links with the motor trade, pointed me in the direction of a ‘Britool’ ratchet. These can be expensive but I found a second hand one on e-bay for less than half the price of a new one and this has survived two seasons so far. The final change to the sheet winches was to fit ‘Winchers’ and this means you don’t need to cleat off the sheet once the sail is winched in. Perhaps if our premium bonds come up we will invest in some self- tailing two speed winches but until then the above system has produced good results at much less cost.
[envira-gallery id=”119528″]