Chainplates

Rigging safety

Corsair dismasting highlights chainplate risk

A Westerly Corsair was dismasted outside Brighton in July 2025 after its aft lower chainplate failed. Inspection found stress-corrosion cracking in a U-bolt that had been holding the chainplate by only a tiny fraction.

When July 2025
Where Outside Brighton
Component Aft lower chainplate

What happened?

The failure resulted in the mast breaking somewhere between its two spreaders. Closer inspection revealed that the chainplate U-bolt had fractured due to stress-corrosion cracking (SCC).

Why can this be hard to spot?

SCC can remain hidden for a long time before a component suddenly fails when stress reaches a critical level. Both corrosion and stress play a part. A fitting may appear to be in good condition externally while a network of cracks develops out of sight. A fractured part may have a rough, pitted and rusty appearance.

In this case, steady saltwater ingress through a chainplate that was no longer adequately sealed contributed to corrosion. Repeated wetting and drying can increase the concentration of chloride ions. The U-bolt was also not aligned with the angle of the aft lower shroud: it stood straight at 180°, rather than being cranked to the required 172° angle.

Historical safety notice

Westerly Group Safety Notice

Westerly rigging failure. The notice below was issued by Westerly Marine Construction Ltd in 1996/7. Owners of the W33/Discus family may have a similar problem with shroud U-bolt nuts.

Notice begins

THIS IS AN IMPORTANT NOTICE FOR THE OWNERS OF THE FOLLOWING YACHTS IN THE WESTERLY RANGE BUILT BETWEEN 1983 AND 1991.

SEAHAWK   OCEANDREAM   OCEANQUEST   OCEANRANGER   FALCON   KESTREL   CORSAIR

Westerly Group actively pursues a policy of continual product and production improvement and development. From this process and in conjunction with the WOA, our attention has been drawn to a potential problem with some of the earlier designs that could be potentially dangerous.

The problem has been identified as the aft lower chainplate of the U-bolt type which have not been cranked. Due to the loads on this fitting and that it does not fully align with the shroud, a levering effect can cause the fitting to break at the thread. As this is below deck, and therefore not apparent from a cursory inspection, it is only possible to see a potential failure by the removal of the fitting from the deck.

The WOA has advised its members of the problem. However this information may not have reached all owners of affected designs. It is therefore hoped that this notice will rectify the situation.

Westerly Group have now designed a fitting which has a larger diameter rod and deck plate and is cranked to the correct angle.

Notice ends

If the U-bolt part of the chainplate has not been cranked correctly, closer scrutiny may be advisable. If fittings below deck show water ingress or corrosion, removing the chainplate for inspection would be a sensible step.

and in other news…

60th Annual General Meeting

60th Annual General Meeting

The WOA’s 60th Annual General Meeting takes place in February 2027. Sign in to view the full details on the event page.

WOA 60th Anniversary Celebrations

WOA 60th Anniversary Celebrations

The South Coast Group kicked off this year’s celebrations with a rally that started in Yarmouth on the Isle of Wight on 15th June and finished in Portsmouth a week later. Twenty-four Westerlys assembled in Yarmouth during the day. The first pontoon party of the rally...

Hawke House Marine

Hawke House Marine

Hawke House Marine in Gosport, Hampshire, have ceased trading as of August 11, 2026. Hawke House have been supplying headlining materials and kits for Westerly boats for over 20 years out of the Heritage Business Park in Gosport. They supplied specialized...